Production Time Options for Different Printing Processes
Under ConsiderationWhy is there only one setting for "default production days"? Each print process should have it own production time settings. Also a bonus feature would be able to have different production times for different quantities of prints. A single digital print is obviously going to be a lot faster than a 10,000 print screen print job! Another bonus would be to implement all of this into a calendar widget or just make it available with the printing price information attached to the blank product view. That would be a game changer!
-
At least the option for the production manager to enter the production time per job.
Comment actions -
I wouldn't need the bottom portion. Just setting a time per decoration method rather than the same for all!
Comment actions
Please sign in to leave a comment.
Comments
3 comments